How are the variations in subcontracting taken care of in SAP?
Answer Posted / pravin bhagwat
Subsequent adjustment can be migo_gs
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What are release procedures with and without classification?
If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?
What are basic tables used for material master?
How are the consignment stocks created?
What are the commonly used movement types in sub-contracting process?
What is cbp?
What do you mean by material type?
What are the various types of master data in the mm module?
How to delete a material completely?
How is the vendor returned processed without a purchase order reference?
A stock transfer was done between two plants belonging to same company code and between two plants belonging to different company code. What will be the difference between the two?
What are different info records types?
What is split valuation? What are the settings reuired for it?
Explain the 'storage location' in sap?
hello guys, could you tell me the few difficult tickets that you have solved in SAP MM??