Hi every one, I am Suneel.
I/p o/p
--- -----
suneel suneel
suneel
suneel
suneel
suneel
how it will get.
Please design job with explain.
Thanks.
Answer Posted / subhash
1. SRC---->TFM---->TGT
in the TFM, by using Looping we, can do this.
@ITERATION<=5
2.SRC---->COPY===>(5copies/links)==>FUNNEL---TGT
take 5 output links from copy stage, pass those to Funnel
then you will get the desired output.
3. SRC--->TGT
run the job 5 time in 'APPEND' mode
Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What are the functionalities of link partitioner and link collector?
What are some prerequisites for datastage?
Can anyone tell me a difficult situation who have handled while creating Datastage jobs?
What is merge stage?
what is 'reconsideration error' and how can i respond to this error and how to debug this
Where do the datastage jobs get stored?
What is staging variable?
how can we validate the flat files using the date in the header and number of records in the flat file? Using both conditions at a time.
Name the command line functions to import and export the DS jobs?
Can you explain link buffering?
Why do we use exception activity in Datastage?
What are the different common services in datastage?
CHANGE CAPTURE
How many types of views are there in a datastage director?
How do you run datastage job from the command line?