Hi every one, I am Suneel.
I/p o/p
--- -----
suneel suneel
suneel
suneel
suneel
suneel
how it will get.
Please design job with explain.
Thanks.
Answer Posted / subhash
1. SRC---->TFM---->TGT
in the TFM, by using Looping we, can do this.
@ITERATION<=5
2.SRC---->COPY===>(5copies/links)==>FUNNEL---TGT
take 5 output links from copy stage, pass those to Funnel
then you will get the desired output.
3. SRC--->TGT
run the job 5 time in 'APPEND' mode
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What are some prerequisites for datastage?
How do you reject records in a transformer?
if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?
What is the process of killing a job in datastage?
How do you import and export the datastage jobs?
What are some different alternative commands associated with "dsjob"?
What is a datastage job?
Whats difference betweeen operational data stage (ods) and data warehouse?
What are the functionalities of link partitioner and link collector?
How to write a expression to display the first letter in Caps in each word using transformer stage ? Please let me know ASAP Thanks in advance...
How do u convert the columns to rows in datastage?
Have you have ever worked in unix environment and why it is useful in datastage?
Define orabulk and bcp stages?
How will you move hashed file from one location to another location?
Have you used Unstructured data?