how many bricks are required for masonary trench having
length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr
on single brick work as well as double ( 9" ) brick work
Answer Posted / arpit garg
we need to have 3905 bricks.
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
What is the per cu. mt. price of ready mix in Gujarat region.?
400 ku d/c clearess ketan hota hai?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
material used for mendrel use to bend epoxy coated rebar
what is the 0 value in quantity surveying
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
VAT and CST ? Which benefits for buyer ? Why benefits?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?