IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / somnath
In case of limit state method, before failure of any member it will show some sign like bending and also we considered a safe factor of safety
while in case of working stress method it will not show such signs.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is 1/8 on the architect ruler denotes?
What is the difference between tor steel and tmt steel?
What is Curtailing of R/F
How to calculate laplength for 3 floors
Why is concrete cube test carried out?
What is the Roll of Water Bonding under VDF road?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
why top layer of block work shoud be full size if any cut block adjustable than another layer?
what is the coefficient for running feet to cft coversion both area and price
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
what is the price of a cubic meter of concrete on international market?
What is Density of cement, sand & aggregate ?
How to cal. The weight of hollow pipe?
What Are The Different Type Of Slump Test Indications?
What is the quantity of cement in mix m20 concrete?