As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / naveed
first of all problem root cause need to be identified and people responsible should be penalized .then rectification options should be be enlisted and effective way need to be adopted for correction..
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the advantages and disadvantages of lead products in construction?
is basic cost of the material includes tax?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
how to caliculate required amount of cement and sand required for 1cu.m.
Define What are the reasons for geotechnical site investigations in Uganda?
How many cement sand ballast in cc 1:4:8 40mm
how statics is different from dynamics
What is missing report and how to prepare
what is the calculation of raw material for 0.35cum of m-15
what is Bearing Capacity,How to determine it?
Describe the advantages and disadvantages of using plastic and timber fenders?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
For what purpose bedding is used under storm water drains, explain?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
what is stressing