What is the permissible limit of silt contain in sand for rcc
Work?
Answer Posted / mohsin
07%
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
What is the strength of 1:6:12 mix?
What are the RISKS during the project construction?
what is features of a typ-ical modern air-conditioning installation?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
Explain what is the difference between built area and super built up area?
How to marking the building
What are the ingredients of pre-stressed concrete?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?