HOW MANY CUBES REQUIRED FOR 7 AND 28 DAYS TEST FOR ALL MIX
GRADES.
Answer Posted / rajah
As per IS 7 days is not required but 7 days result is just a cross checking (7 days result must more than 77%)
for 28 days
concrete in cmt no of samples(3 cubes)
1) 1 to 5 1
2) 6 to 15 2
3) 16 to 30 3
4) 31 to 50 4
5) 51 and above 4 plus one additional sample for
each additional 50 cmt
| Is This Answer Correct ? | 23 Yes | 9 No |
Post New Answer View All Answers
Explain different types of rcc pipes.
satart to end steps by step process of building construction...? i want to planning theme accuretly
How much does the leaning tower of pisa lean?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
How do you prepare Material Recovery Statement for deduction from contractors bills?
how statics is different from dynamics
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
how many shuttering material required for 1000 sq.m built up area.
400 ku d/c clearess ketan hota hai?
What will be weight of 0.5mm GI sheet per sq.ft?
important question on stones
What is a kip?