HOW MANY CUBES REQUIRED FOR 7 AND 28 DAYS TEST FOR ALL MIX
GRADES.
Answer Posted / rajah
As per IS 7 days is not required but 7 days result is just a cross checking (7 days result must more than 77%)
for 28 days
concrete in cmt no of samples(3 cubes)
1) 1 to 5 1
2) 6 to 15 2
3) 16 to 30 3
4) 31 to 50 4
5) 51 and above 4 plus one additional sample for
each additional 50 cmt
Is This Answer Correct ? | 23 Yes | 9 No |
Post New Answer View All Answers
What is costing in 100squre feet bricks
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
How to build the floor to ceiling bookcase?
For what purpose bedding is used under storm water drains, explain?
at which depth the construction of tunnel is economical from cost and engineering aspect.
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What is the snap size in civil and how can we create it?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
what is cross hair cursor?
Difference between lime, distemper and plastic emulsion?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
how statics is different from dynamics
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.