Answer Posted / viral
I will like to add one more reason, in case the earthing
opens between panel and ground then the fault tend to
divert directly to PLC panel. This in return will blow off
cards in PLC. Thus the earthing is kept different.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Dear sir, In our plant have Station Transformer having capacity,i want to know, why LV side 40 - 40MVA is given? & how we can get 6.3 KV supply from tertiary(i.e. Open delta connection), Vector Group YNyn0 - yn0 +d MVA Rating 80MVA / 40 - 40MVA + 26.7MVA Voltage rating 420 (Tap range +6,to -10)81.25% /11.5KV - 11.5KV +6.3KV
List out the different frequency domain specifications?
for what voltage will reactive power be largest in 380 kv line : a) 375kv b)380kv c)385kv
I want to know Electrical Circuit?
how to get electrical supervisor competency certificate in gujarat. i did 3 year diploma in electrical
For a spring controlled governer the relation F = ar+b (F is the controlling force, r is the radius of rotation a and b are constants), indicates that the governer is
What is ferro-resonance in electrical system? Why it occurs and what are measures to prevent it?
AL=0B9H,bl=75H, ADD AL,BL AL=____________? CF________? OF___________?
explain types of electric welding and its applications
Why have to use copper cable for local isolator to motor ?
What are protections for dty type transformers
WHAT IS THE WORKING PRINCIPLE OF A GENERATER.how is a GTG (Gas TURBANE Generater) working.plz explane
What is the working principle of CFL & T5 tube light & 40W tube light with electronic ballast?
What is mean by hot and cold loop testing? What is the difference between them?