Answer Posted / pranav panchal
To reduce the heat of hydration
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
strength vs shape factor
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
what would be the design load of R.C.C Cooling tower per cell.?
What is the difference between Fe 500, Fe 500 D and Fe 515.
What is portland cement
how to preaper for interview wat they asked in interview give me idea
What are the main reasons for conducting pull-out tests for soil nails?
How and where are aqueducts built?
What are the ingredients of pre-stressed concrete?
60-70 grade of Bitumen is VG-30 ?
How do we calculate the power of centrifugal pump?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?