Answer Posted / gurram
O2 Analyser works on the principle of Paramagnetism principle.
This analyser contains two cylindrical chambers one reference
chamber and the other one is sample chamber.In the sample
chamber a permanant magnet will be fixed.In both the chambers
there will be pre defined heated ring resistors will be placed
which forms a wheatstone bridge.If the process gas without o2
passes in both the chambers.As there is no o2 the bridge is in
balanced condition only.If the process gas contins o2 flows
due to magnetic effect the flow in the sample chamber will
increase and there is a unbalance in the temperature of the
ring resistors.The difference will be processed and displayed
as percentage of o2 presented in the process gas.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What is the reason PT speed not incresed in gas turbine?
Using your own examples solve a problem involving normal table. (experimental method and analysis)
explain key exchanges in all security modes WPA,WPA2,TLS?
What is three element drum level control system why its better than single element?
can you provide me full detail about instrumentation in ONGC??
i want formula for flow control.am doing project in flow control using orifice . i know value of the flow level(Q) . upstream(p1) pressure, orifice diameter(Do) , pipe diameter(Di) and oil viscosity(Vi) how can i calculate downstream pressure
draw the block diagram of a level transmitter ?
I have 0.75mm sq multicore cable (IS type) , can use instead of same type but 1.5 sq mm cable ? Note : The distance is around about 150 meter.
Whether the DI, DOs shields can be connected with Analog Input Shield Earthpit?
The Design Calculation of Level Transmitter For Different Structure open & Closed Vessel, Eg. Diff. Level Tx., Capacitance For Continous Operation
whatis range of marcury filled tempereture gague
I want measure the volumetric flow of gas in waste heat recovery Boiler?Tell me how and which type of instruments required. Plz mail me:naba02222@gmail.com Sam please post the answer .
How r the calculation of process line mpm.
any body please send me the old question papers of ongc test.
why we use cascade control and feed forward control in 3 element drum level control measurement of steam drum .what is cascade and feed forward control system ?give example .