Answer Posted / navin kaluti
Step and Counter specify the sequence in which system
processes the condition types and places them in the sales
document.
Step: specify different level.
Counter: (sub-step) is used if you want several condition
types at same level.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Is there any one who can teach me SAP SD CIN ? I am ready to pay him. Presently I am in PUNE Location. Please Contact me its Urgent - 09987059674, E-Mail ID : sheikhbsa@gmail.com. Possible to me Teaching Location MUMBAI AND PUNE Location.
I have created value contract with order type WK1 in VA41. The target value is 500 USD and the net price is 1000 USD. There was no pop up message or error thrown while saving the contract when the net price exceeded the target value. And the system allowed to save the contract. Is there any configuration available to activate the warning or error message or any enhancement need to be done?
what are the organizational elements required for the sd transactions
What are the influence factors for account determination for invoices?
Mention what is the reversal pgi? Can you cancel the pgi and mention the transaction code for pgi?
Which type of aptitude question
I am in the va02 transaction for a sales order and want to reject the line items and cancel the entire sales order. What is the menu path needed to achieve this goal?
what is application key in account determination where its mentained. plz ans its urgent
What is the difference between sd account key and fi account key?
What is an outline agreement?
Explain sales document blocking?
Hi,In transportation while am creating shipment cost document am getting this error "forward shipment cost items incorrect" kindly any one answer me.thanks in adv
What Time Neede to Upload Master Data and Trasaction Dat From Non SAP Systum to SAP Sys. through LSMW Tool ?
What are the various qualifier option or what are the various import options? : transportation management
In one sales order there are two materials can maintain two different pricing procedures for these materials?