I've one slab of 24m x 43m. How to calculate required steel
For this slab.
Answer Posted / ronak shah
generally it is depending upon the design of slab, becasue
you have such big sapn so there is beam between them. its
depends upon how to design the slab by structral engineer.
generally its depends upon client rquirement.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
yasser arfatcompleted his degree in civil from which university
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
how to tie 10 legged stirrups
Define Who designed the city of Washington DC?
Why the finite element method is lower bound solution?
what r the precaution for high in atp tempareture,low in atp tempareture
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
How do you calculate the power of a centrifugal pump?
what is the difference between replacement of cement by groundnut shell ash
What are the disadvantages while using stone dust as filler in pavements?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
what else we can add rather than admixture in concrete to reduce the cement quantity?