Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

If i have 200 test cases and we have to execute but we
don't have time to execute all testcases.within 1 hour we
have to execute that testcases and prepare the test
report.so how i have to resolve this problem? is there is
any technique in the testing.

Answer Posted / amjathk

we can execute this scenario by different methods

1. we can combine two or many test case into one test case and execute like scenarios which are parallel - disadvantage: this method can only be executed by a person who has written all test case.

2. the person who deep knowledge on the product can test with in given time(SME)

3. we can use 'all-pair testing' techniques to decrease the test case count, but doesn't exclude the scenario's.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How earthing/grounding done in aeroplanes and ships.

3619


What is the tension required for the 25000 CFM AHU belt

2482


why are the maintaine power factor and how can this control and this is how work.

1969


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1785


I have 2 KW electric water heater.I am gonna use it in controlling water temp.so I needed to increase or decrease the heating capacity.is there any electrical-electronic circuit for varying the resistance & so current?

3278


with out colour codeing on conductor how can be find what is r,what is b,what is y phases.....

1949


Whar is the KvA rating of 33Kv substation & actual kv rating of power generaating station.

2390


What is the capacitance values of 132,220,400 & 765 kV current transformer

1918


How many types of electrical earthing are there?

1173


What are marginally stable systems?

1097


give some advantages and disadvantages of combiniing the session, presentation, and application layer in the osi model into one single application layer in the internet model

2698


I completed my BE EEE degree 2006 .... which license should i apply .... ?????

1704


WHAT ARE THE DATAS REQUIRED FOR PROTECTION AND METERING AND CONTROL AND LOGIC PREPARATION,HOW TO STUDY THE PROTECTION AND METERING?

2204


I want definition for ABT Meter (Availability Based tariff) ?

1992


Explain the operation of variable frequency transformer?

1138