If i have 200 test cases and we have to execute but we
don't have time to execute all testcases.within 1 hour we
have to execute that testcases and prepare the test
report.so how i have to resolve this problem? is there is
any technique in the testing.
Answer Posted / amjathk
we can execute this scenario by different methods
1. we can combine two or many test case into one test case and execute like scenarios which are parallel - disadvantage: this method can only be executed by a person who has written all test case.
2. the person who deep knowledge on the product can test with in given time(SME)
3. we can use 'all-pair testing' techniques to decrease the test case count, but doesn't exclude the scenario's.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is vaccum currcuit breaker.define with cause and where be use it device?
XYZ
The power factor of the fixed load is 0.8, now the p.f is varying from 0.8 to 0.5.
How to select a contactor? How many types of contactors are available
please explain to me how to calculate current,voltage,resistance with formula??
What do you understand by external characteristics of a d.c. Generator?
why dc is used in control circuits for MV & LV switchgeras instead of ac
In hydel power plants, L.A's, S.C's are placed inside the control panel boards. what is the purpose? [already the total body was earthed to ground.]
what is ratio of copper wire size and current ?
when elecromagnatic waves are propogated in a wave guide?
What is the effect of solar radiation on the design of an Isolated Phase Busduct?
I need HT sphere gap calibration table. Can any body help me.
Please brief me about number of pole in alternator.In single phase alternator coils are connected in star or series. How to calculate frequency for the same.
when generator short circuit condition, the current how dissipates. or at short circuit voltage not available then current how can flow?
we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.