i have 4 jobs i want run 1job should run on 1node and 2job
runon 2node
and.... how to make it possible?
Answer Posted / subhash
Create 2 Configuration files.. 1 file with 1NODE and 2nd file
with 2NODE configuration.
Open the 1st job,
Go to the 'TOOLS'-->'Configurations' --> Select the 1NODE
configuration file from Drop down list.
Open the 2nd job,
Go to the 'TOOLS'-->'Configurations' --> Select the 2NODE
configuration file from Drop down list.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what is the difference between == and eq in UNIX shell scripting?
What are the steps needed to create a simple basic datastage job?
how do u catch bad rows from OCI stage? And what CLI stands for?
How a server job can be converted to a parallel job?
what are .ctl(control files) files ? how the dataset stage have better performance by this files?
Difference between sequential file and data set?
What is the difference between odbc and drs stage?
There are two file are there .1st file contains 5 records and 2nd file contain 10 records in target they want 50 records.how can achieve this
Explain the importance of surrogate key in data warehousing?
What is the use of datastage designer?
Where do the datastage jobs get stored?
How the ipc stage work?
Difference between IBM DATA STAGE8.5 and DATA STAGE9.1 ?
what is repositery?
Can you highlight the main features of ibm infosphere information server?