i have 4 jobs i want run 1job should run on 1node and 2job
runon 2node
and.... how to make it possible?
Answer Posted / subhash
Create 2 Configuration files.. 1 file with 1NODE and 2nd file
with 2NODE configuration.
Open the 1st job,
Go to the 'TOOLS'-->'Configurations' --> Select the 1NODE
configuration file from Drop down list.
Open the 2nd job,
Go to the 'TOOLS'-->'Configurations' --> Select the 2NODE
configuration file from Drop down list.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what are .ctl(control files) files ? how the dataset stage have better performance by this files?
what is repositery?
Define oconv () and iconv () functions in datastage?
How will you move hashed file from one location to another location?
i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS
Define project in datastage?
What is use Array size in datastage
Name the command line functions to import and export the DS jobs?
What are routines in datastage? Enlist various types of routines.
Where the datastage stored his repository?
disign the complex job in u r project?(they are aksing only complex job design and then data flow...)
What is a ds designer?
Is the value of staging variable stored temporarily or permanently?
how to add a new records into source?
What are the different kinds of views available in a datastage director?