Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to amps calculate from 1KVA?

Answer Posted / sohan lal

=1000/(1.73*415)=1.39A

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In Air circuit breaker LSIG protection unit is used. Without fault in cables (2 runs 3Cx150Sq.mm Copper, 1Kv grade, XPLE armored cable IR value is more than 550Mohm @ 500V Megger) and load section Long time Overcurrent protection is triggers and trips the unit. We changed LSIG protection with new factory tested unit. Even then fault is persisting. Please suggest the possible causes

855


The synchronous machine excitation system explain

1872


We have 750KVA DG set, we want to introduce REF relay with 1250/1A,CL PS,Current transformers.The lead distance of 2.5mm copper flexible cable from CT to relay is around 5mtrs.We would like to know the knee point votage(VK) & IM calculion for CT's

1973


can some one clearly explain why -48 volt DC use in telecom site????

1743


what is the function of gss in the dg set.

2020


What is Scheme Test of High Voltage Switchgear. Which tests it includes.

2460


Can anybody inform me about the pattern of ECIL GET( Graduate Engineers Trainee) interview for Electrical students? Will there be HR round as well? I thought of preparing for 2 to 3 subjects thoroughly. Will it be sufficient? Please share your thoughts.

2192


How much depth n width required for laying of 1X70 Sqmm Cable in Desert???

1674


design a LV scheme for a 15 storied building?

2002


Yazaki india pvt ltd interview questions qurey related

1076


how much value of resistance should connect to 15 kw, 6 pole 3 phase slip ring induction motor having RV-240, RA-42.

1973


how we can come to know that motor winding resistance which showing by DMM is right or wrong???is there any chart or something that we will compare & check???

1973


What test must you do before powering up a circuit that you have been working on?

1906


How harmonic block test are conducted on relays ( Siemens,Areva ect )power transformer using omicron kit?

2337


1.what is meaning of curve into a mcb. 2.what is basic reason changing of curve

2048