i 10 jobs first two jobs are runing in 2nodes,next 2 jobs
are running in 4 nodes, next 4 jobs are running in 6 nodes
and the remaining jobs are running on 10 nodes. how to
change the node configuration?
Answer Posted / subhash
First create 3 Configuration files(2 Node, 4 Node and 6 Node
config files).
in the job, go to the 'TOOLS' tab,
then go to 'Configurations' select the on which node
configuration file you want to run the job.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Where do you see different stages in the designer?
What is the flow of loading data into fact & dimensional tables?
What are the steps required to kill the job in Datastage?
How do you generate sequence number in datastage?
Explain connectivity between datastage with datasources?
What could be a data source system?
Hi All , in PX Job I have passed 4 Parameters and when i run the same job in sequence i dont want to use those parameters , is this possible if yes then how
What are the types of containers?
Can you filter data in hashed file?
Hi, what is use of Macros,functions and Routines..? At what situation you are used. If you know the answer please explain it. Thanks.
How many Key we can define in remove duplicate stage?
What is the difference between odbc and drs stage?
What are the steps needed to create a simple basic datastage job?
How to clean the datastage repository?
project Steps,hits, Project level HArd things,Solved methods?