Answer Posted / awadhesh kumar sharma
600MM ABOVE FLOOR LEVEL AND 600MM BELOW BEAM LEVEL THATS MEANS WHEN CLEAR LENTH OF COLUMN IS 3M THEN LAP ZONE IS 3-.6-.6=1.8
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
Material calculation of cm 1:6 for 1sqm
How many kilo-newtons equals 1000 kilogram?
What are the different softwares used for cad?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
why we use 19x9x9and 20x10x10 but not other
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
How to build the floor to ceiling bookcase?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
What happens to Load at yielding ?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
what is the calculation of raw material for 0.35cum of m-15
What is componsation
what is the types of door's wood?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
Which IS Code/American Code applied for coupler test of steel