where you provide overlap on column?

Answer Posted / awadhesh kumar sharma

600MM ABOVE FLOOR LEVEL AND 600MM BELOW BEAM LEVEL THATS MEANS WHEN CLEAR LENTH OF COLUMN IS 3M THEN LAP ZONE IS 3-.6-.6=1.8

Is This Answer Correct ?    3 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?

2032


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2729


what is pile and deam foundation

1799


4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils

2283


what is the breaking strength of wall tiles

1931






IS code for grade of concrete for bamboo lintel????

1680


Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000

1215


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1484


how to calculate reinforcment in staircase cranked beam?

2179


how i get all type of short type question answer about civil engg

1271


What is the basic difference between OPC

1416


what is the weight of 10mm,20mm,40mm aggregate

1993


What is a bearing capacity of soil?

793


What does civil engineering mean?

640


Why we provide hair pin for shed

1905