Answer Posted / waseem athar
Lap should be provided in splice zone or mid zone of column and it should be 50 times of dia of bar.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How many cement sand ballast in cc 1:4:8 40mm
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What are the steps involved in the concreting process?
Which is stronger solid steel rod or hollow steel pipe?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
What does civil engineering mean?
what are the changes in concrete pour height as per IS 456, 2009?
sir please send me campus placement questions in civil engineering
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
What is binding spacing of the rebars at lapping zones.
What tor stands for in tor steel?
what are RIB slabs explain about it