Can anyone tell me the thumb rule for calculating structural
steel quantity?

Answer Posted / rohit wankhade

Steel quantity = Wt/m of bar x length of bar x No. of bars

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''

1635


beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

1642


Is there any course for billing available in Mumbai? If yes then please mail me the details..

1801


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?

1846


how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?

1945






VAT and CST ? Which benefits for buyer ? Why benefits?

1396


For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?

1476


What is horizon or horizontal mining?

632


What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????

2346


What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

636


types of piles detail,

1810


What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.

4422


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

1610


Cement consumption of one cubic meter of aerocon blocks masonry?

3657


find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

1800