Answer Posted / bilal ali khan
iN ZONE A That is in between
for example
colimn dimensionj all in mm
lenght=1000
breadth=300
height=2440
so we will take lenght 1000 and take it from bottom and take it from top of bottom
left space in between is 440mm it is zone a
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
What is the difference between undo & redo?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
can stub column take the load as main column
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
Why was the empire state building made of steel?
what radial pressure, the NP2 class rcc pipe can sustain?
WHAT IS YOUR CURRENT SALARY
Explain what is Critical Path Method (C.P.M)?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
Describe the various methods of concrete curing?