Answer Posted / ratheesh
Column - Mid of the span u can lap, Min 50% rods only lap in
a floor.
Beam - should be lap in one, third of length. don't lap in
mid span....
| Is This Answer Correct ? | 26 Yes | 5 No |
Post New Answer View All Answers
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
how to calculate the size of triangular ring in rcc column?
what is the weight of 6000 psi concrete in lb/cft?
How did street originate in the plumbing term street ell?
detailed calculation of the amount of cement used?
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
How can you distinguish between sorption, absorption and adsorption?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
What is quantity of cement and sand required for 2000sqft of tiling?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
Why is concrete cube test carried out?