Answer Posted / eid elatawy 01000470262
1.PM Preventive maintenance To check the instrument and do the needful to prevent any failure may be done in the future.
2.CM Corrective maintenance:to correct the function of the instrument.
3.RCM Reliable centered maintenance filter PM problems in the instruments to obtain the maximum performance of maintenance for example each PM we found problem in LTXX01 we will change the type of this Tx to improve the maintenance performance.
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
the 3 most common transmitter protocol being in refinery or qatar gas and aramco.
Capacitance, resistance ( colour coding ), parallel & series circuits.
Programmable Logic control.
Explain types of valves?
How to Calibrate Flow Switch in field
Identification of ss fittings, pilot valves, relief valve.
please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com
how many types of viberation transmitter and how to calibrate and where use of vibration transmitter
What is Span Error
Instrument QA/Qc what is the project quality plan?conduit inspection RFI. which documents attache with package?
Where are oxygen analysers installed in cfbc boilers? What are their usual readings?
Im having problems with interfase betwen SPI v7.0 and SPPID v5.05. Previous versions of Intools shoul be fixed with SPPIDproj.ocx file. It was necessary to replace this file with one that allows the connection between different versions of SPPID. It is necessary in the current version to do the same?Thanks
How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?
What is the procedure of calibration of Load cell?
If relative y axis vibration sensor is by passed, and relative x axis and absolute sensor is left working. how much monitoring i would have risked?