While casting slab at what length slab casting should be stop
Answer Posted / manoj kumar bhola
AT L/3 OF THE SPAN THE SLAB CASTING SHOULD BE STOP.WHERE L IS THE LENGTH OF SPAN.
Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
what is the service corridor?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
How to find permissible diagonal tensile stress in reinforced brick work
How to take labor charges for construction of 1cum of concrete?
how calculate the bearing from two coordinates?
Specific gravity of cement?
What is semirigid connections?
what is the theoritical percentage of concrete cubes testing per day?
What was asked in isro civil interview
as per is code, what is the minimum content of opc and ppc cement for rcc structure
Explain the latest method to detect a crack in a building?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
how we can find sieve #4 is 4.75mm?
What is the coeffiencent Friction Angle between Steel and Ashphalt?