Answer Posted / yash kandari
O.C:- M10, M15, M20
S.C:- M25, M30, M35, M40, M45, M50
H.S.C:- M55, M60, M65, M70, M75, M80
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Which is the best book for building construction?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
I need to constructive work in amaraj batteries
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
60-70 grade of Bitumen is VG-30 ?
what are the challenges of being a team leader and a supervisor?
what is moment-curvature relationship in semi rigid connections??
rate analysis for cement pointing 1:4 , for 100 sq m
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
Explain the advantages and disadvantages of using plastic and timber fenders?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
Define graphics window?