Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many bricks,cement,sand of a 40*30*6 ft bowndry wall?

Answer Posted / hany

The total qty:
Bricks: 450*203.88= 91746, say 91800 Nos
Cement: 13*203.88= 2650.44, say 2655 Bags
Sand: 2.58*203.88= 525.24, say 530 cum

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how is the reinforcement is distributed in triangular slab

2249


give me the mix proportion for design mix concrete M 7.5 grade 1:4:8

4040


Explain the different types of roofing systems?

1256


Explain how you can turn off the display for dimension in CAD?

1168


can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?

2581


which steel is better for residential building tmt steel or hysd steel

2268


Cement consumption of one cubic meter of aerocon blocks masonry?

4125


How to do base isolation for RC framed structure using ETABS software?

4210


What are the different approaches in designing the floors of the service reservoirs?

1190


What things architect have to take care of before starting any project?

1292


Formula for calculating the volume of bulb in underreamed pile

5038


I need to constructive work in amaraj batteries

1877


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

2110


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2362


reinforcement slab, beam and column formulas?

2698