What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / hany
Beam sides- 24 hrs.
Beam(spanning upto 3mtrs) bottom- 10 days
Beam(spanning more than 3mtrs) bottom- 21 days
slab (spanning upto 3mtrs)- 7 days
Slab (spanning more than 3mtr)- 14 days
rcc wall- 24 hrs
Footing- 24 hrs
Staircase soffit- 7 days
| Is This Answer Correct ? | 40 Yes | 10 No |
Post New Answer View All Answers
dialation means
in design case of structural member best suitrable percentage of steel limit is what
Why are steel plates inserted inside bearings in elastomeric bearing?
afe or not
Aptitude, reasoning, quants, verbal and technical question
what is shuttering co efficient?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
what is labour consume factor in residential projects
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
what is the formula to find the diagonal shape stirrups?
How to testing voids of filled aggregate in bitumen mix design
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
what is Brest Wall?
on what basis the partial factor of safety are decided? form the load combinations
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight