What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase

Answer Posted / hany

Beam sides- 24 hrs.
Beam(spanning upto 3mtrs) bottom- 10 days
Beam(spanning more than 3mtrs) bottom- 21 days
slab (spanning upto 3mtrs)- 7 days
Slab (spanning more than 3mtr)- 14 days
rcc wall- 24 hrs
Footing- 24 hrs
Staircase soffit- 7 days

Is This Answer Correct ?    40 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is labour consume factor in residential projects

1844


What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?

691


why development length = 50D . why not 100D

1466


what isload waring calculation

1887


How do we calculate absolute pressure?

764






I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

1776


how to convert cement, sand aggregate quantity from M3 to kg with full description?

1586


What is the difference between Grade I, II and III of GSB?

1885


how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

1491


what is diversion?

1735


Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?

1579


What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code

1602


Test procedure of fly ash bricks as per code ?

2115


Calculation of curtain wall of box culvert

5304


how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation

1204