What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / hany
Beam sides- 24 hrs.
Beam(spanning upto 3mtrs) bottom- 10 days
Beam(spanning more than 3mtrs) bottom- 21 days
slab (spanning upto 3mtrs)- 7 days
Slab (spanning more than 3mtr)- 14 days
rcc wall- 24 hrs
Footing- 24 hrs
Staircase soffit- 7 days
Is This Answer Correct ? | 40 Yes | 10 No |
Post New Answer View All Answers
what is labour consume factor in residential projects
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
why development length = 50D . why not 100D
what isload waring calculation
How do we calculate absolute pressure?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
how to convert cement, sand aggregate quantity from M3 to kg with full description?
What is the difference between Grade I, II and III of GSB?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
what is diversion?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
Test procedure of fly ash bricks as per code ?
Calculation of curtain wall of box culvert
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation