Answer Posted / linu t.m
A small change in the above answer, 1 feet=0.3048m
so, 1 m=1/0.3048
=3.281feet
so,6*6/162=0.222
So 0.222 kg for 1m length.
for 1 ft length,
0.222/3.281=0.068Kg for if 6mm dia bar
| Is This Answer Correct ? | 20 Yes | 0 No |
Post New Answer View All Answers
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
How can we convert weight batch to volume batch for m30 mix
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
why building got air crack? if it get in one particular are what is means?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What is packing Factor ?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
What out turn civil works
how to shuttering is used in slab
What is the primary difference between adsorption and absorption?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
What are segregation and bleeding?