Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the earthing conductor & no. of earth pits
required

Answer Posted / sudhakar.g

The earth resistance of single rod or pipe electrode is calculated as per IS 3040:
R=100x&#961;/2×3.14xL (loge(4xL/d))
Where:
&#961; = Resistivity of soil (&#937; meter),
L = Length of electrode (cm),
D = Diameter of electrode (cm)

Example:
Calculate number of CI earthing pipe of 100mm diameter, 3 meter length. System has fault current 50KA for 1 sec and soil resistivity is 72.44 &#937;-Meters.
Current Density At The Surface of Earth Electrode (As per IS 3043):
• Max. allowable current density I = 7.57×1000/(&#8730;&#961;xt) A/m2
• Max. allowable current density = 7.57×1000/(&#8730;72.44X1) = 889.419 A/m2
• Surface area of one 100mm dia. 3 meter Pipe = 2 x 3.14 x r x L = 2 x 3.14 x 0.05 x3 = 0.942 m2
• Max. current dissipated by one Earthing Pipe = Current Density x Surface area of electrode
• Max. current dissipated by one earthing pipe = 889.419x 0.942 = 837.83 A say 838 Amps
• Number of earthing pipe required = Fault Current / Max.current dissipated by one earthing pipe.
• Number of earthing pipe required = 50000/838 = 59.66 Say 60 No’s.
• Total number of earthing pipe required = 60 No’s.
• Resistance of earthing pipe (isolated) R = 100x&#961;/2×3.14xLx(loge (4XL/d))
• Resistance of earthing pipe (isolated) R = 100×72.44 /2×3.14x300x(loge (4X300/10)) = 7.99 &#937;/Pipe
• Overall resistance of 60 no of earthing pipe = 7.99/60 = 0.133 &#937;.


If you have any doubt regarding this ...pls mail me sudhakar28485@gmail.com

Is This Answer Correct ?    4 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we permissive overreach in distance protection.where it is applicable to use in long r short lines

2702


How two nos. 130 kw D.C motor get synchronise using D.C drive.

2051


Define active filter?

967


what are the parameters plays a major role in Potential transformer Burden calculation??

2121


how can we make cable shedule for controll wiring ? which details must be required for it.?

2081


give some advantages and disadvantages of combiniing the session, presentation, and application layer in the osi model into one single application layer in the internet model

2649


which mm cable should be used for 1.hp immersible pump motor for the distance of 330 metres?

1668


Define Electrical Insulation and examples of Solid,Liquid and Gaseous insulating materials?

1708


How to decide DO set rating of Transformer?

1612


what is formula for calculate thermal overload in new numiricalrelay( not in bimetal relay)?

2261


WHAT DO YOU MEAN THE DIFFERENT TYPE OF CURVES OF RELAY LIKE STANDARD INVERSE, VARY INVERSE, NORMAL INVERSE, LONG INVERSE ETC....

1912


how to enter inverter parameter? without manaual?

1981


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1739


clarify types of motor operated valves and advantages

1853


what is the difference between pvc & fiber glass cables

1505