Answer Posted / prasanna surendra magdum
It is the foundation made at much deep level,because hard
starta of soil is available at lower level considering
structural design of building &
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Exterior Joints,define
whaat is blister in box girder bridge and what is its function..
Forces in a Shear Wall are in plane or out of plane ?
what radial pressure, the NP2 class rcc pipe can sustain?
why the openings of sieves are square io size?
How to calculate woden area in sft and Cft
what is difference between GTS bench mark and temporary bench mark
Consumption of Binding wire for fixing of cover block in vertical surface
What is hybrid foundation?
Why concrete barriers have curved surface profiles?
roll of DLC in road constructions
How to calculate the load of partion in flat slab if we use brick?
What are the basic use of runners and standards of pipelines?
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.