Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why drum level is increased when one of the running coal
elevations are suddenly tripped?

Answer Posted / randhir singh yadav

In boiler drum level depends on steam pressure, when one of the running coal elevation suddenly tripped, steam pressure decreases, so drum level increases.

Is This Answer Correct ?    18 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

LAPT working in alternator / generator

3626


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1699


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1708


What is difference between secondary Air & Tertiary Air and Their use.?

2005


How to calculate power press toneage

2061


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1005


some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

2419


what's the moog valve

1512


what is the meaning of SST300 V56A in SIEMENS turbine

4360


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2288


what is the trip circuit supervision in an electrical meaning?

2124


operation

1890


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2487


what does mean by kva rating

1508


How We Calibrate the vaccum transmitter?

1976