Answer Posted / rishabh thakur
absolutly right, i am agree with Mr. sunil, bcz the material used(cement ,fine etc.) expand with temp.so it should be provided b/w to complex
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
What is labor and material payment bond?
Advantage of Aluminum form work in terms of activities can be skip and cost too
what is parametre for M25 after 7 days strength
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
what is Short bored pile foundation.
how to find hardness of water?why it should be determined?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
PL.tell me about civil engineering questions with answer
what is the criteria for the finalisation of pavement thickness in road project?
what is diversion?
how much cement and sand required for 1cum rr masonry
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?