1.where in India the maximum transmission voltage is operated?
2.what the methods are used to cool down the
transformer?give the specific ratings of the transformer &
specific cooling process.
3.how zero & negative sequence reactances are formed in a
rotating machine when fault occur in the system?
Answer Posted / dr. mohd. arif khan
2. the different cooling processes are oil forced(OF), air
natural(AN), OFAN, OFAF, ONAN and ONAF. for higher rating
like 5MVA transformer the cooling is ONAF type.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is cable tray, its type, and its support?
What is knee point voltage?
diff b/w elcb and rccb
Percentage losses in power generation?
what is power factor ? how we can calculate the low power factor and amount of capacitor for improve that low factor ?
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
how to calculate regulation constants for over head lines? and what are the regulation constant for raccoon conductor at different voltage level and different P.F?
will there be any problem by recovering slip from single phase induction motors?
Is there any Institution for giving M-tech in Electrical engineering for those who r in service? Give the details please.
What is the capacitance values of 132,220,400 & 765 kV current transformer
what is the function of choke in the flourcent tube lights and why the colour is in white mostly in flourcent tube lights
any application of back emf
UG cable sizes were specified in sqmm. But practically its not coming to mesure. What's the reason for that? And how they specify the size of the cable?
Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.
After completing iti in electrician, how can i get certificate of electrical supervisor? What ia requirements. For it?