Answer Posted / isaac p
Fault level is a point where the normal operation level
has been exceeded and the system shuts down or other
components are called to rescue the situation.
| Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
Consider three heater bank connected in 3 phase star with neutral.Each heater bank connected in each phase.So each phase get 230 volts supply.my question is,during balance condition, current flow in neutral or Not
Why a Permanent Magnet Generator has higher frequency as compared to frequency of main alternator?
Dear all i want to know SEWA Electrical Supervisor Licence test Previous Year Questions ? If any body know please send to me zohairaukllah@yahoo.com
what is transient enclosure vltage , very fast transients, very fast transient over voltages
Explain the laying procedure and laying depth of submarine/subsea power cable for 220/400KV system? Also available cable diameter?
What is the rate of WCT on the Electrical Contracts comprising of DG Sets and Civil Works in Delhi ?
What is DTR erection?
R=*ΒΆ l/a
Why we find the sensitivity for the CT's to check?
what is stper motor
new 90kw motor installed so how I purchased cable ,fuse,etc please give me technic for cable selected why always capacitor delta connection
Damping resistor provided in open delta (tartiary) winding of a measuring PT at the incoming of a MV inverter drive panel is getting heated up. Can any body explain the reasons and suggest the remedy?
how we can calculate 2 phase welding transformer rating or total power?
What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side
If UG power cable both ends are to be earthed or what? If not why?