relation bet Coefficient consolidation Cv, time factor Tv,
drainage path d, & time t is
Cv=d2Tv/t
Cv=d2t/Tv
Cv=tTv/d2
Cv=Tv/td2

Answer Posted / nawal k dwivedi

Its first one i.e Cv=(Tv)(d^2)/t

Is This Answer Correct ?    13 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the mode of method of face bar measurement

2062


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1208


How is the strength of cement measured?

715


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

1714


what is anchorage length,lap length and (dont remember the last one)

1738






How to do bbs in excel format

1594


What is a bearing capacity of soil?

815


material used for mendrel use to bend epoxy coated rebar

1704


Can inverted beams used in pipes during construction?

870


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

5797


how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?

1988


what is the meaning of degreasing of the euipment or line.

3315


Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)

2008


Please tell me vasthu room sizes. Thanks.

1763


IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN

1373