relation bet Coefficient consolidation Cv, time factor Tv,
drainage path d, & time t is
Cv=d2Tv/t
Cv=d2t/Tv
Cv=tTv/d2
Cv=Tv/td2
Answer Posted / nawal k dwivedi
Its first one i.e Cv=(Tv)(d^2)/t
| Is This Answer Correct ? | 13 Yes | 1 No |
Post New Answer View All Answers
how gradation of aggregates effect on slump of fresh concrete?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
in the earthquqke the profile of water on dam is parabolic or not
which has high compressive strength between hollow block and brick masonry?
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
How to calculate canal slope curvature qty!
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
What is gravity flow?
Calculation of Pier Cap with tapper area?
how do we design mix ratio?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
In cement concrete how to check a quality of material also proportion of material at site ?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
where i can get material costs on weekly basis
Critical Path Method is...