how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / misal dinesh
Take The Ratio - 1:1.5:3
For 1 cu.m wet volume consider its dry volume 54% more
i.e = 1.54 cu.m of concrete.
Total Volume of concrete for Mix= 1.54/1+1.5+3 = 0.28 cu.m
Total quantity of cement for Mix= 0.28/1 = 0.28 cu.m
Total quantity of cement in bags= 0.28/0.035 = 8 bags
Total quantity of Metal for Mix= 0.28/1.5 = 0.187 cu.m
Total quantity of sand for Mix= 0.28/3 = 0.093 cu.m
| Is This Answer Correct ? | 9 Yes | 7 No |
Post New Answer View All Answers
which method is used in semi-rigid connection design??
Gidc technical que paper
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How does siphoning work?
roll of DLC in road constructions
Define What is the difference between routing maintenance and major maintenance in school facilities?
material used for mendrel use to bend epoxy coated rebar
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
What are the uses of groynes?
What is the procedure of concealed plumbing in toilets?
explain what do you mean by the property development.
How to calculate chejja reinforcement
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
Can we use the flyash bricks in brick bat coba?