What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / krishan
slab-7days
columan-24hours
beam bottom-3days
beam side-24hours
rcc wall-48hours
footing-12hours
staircase-7days
Is This Answer Correct ? | 6 Yes | 9 No |
Post New Answer View All Answers
Which code is used for tor & tmt steel bar?
Stringer How many cm goes to landind
material used for mendrel use to bend epoxy coated rebar
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
in design case of structural member best suitrable percentage of steel limit is what
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
what is tension footing?
What are the advantages of cad software?
Which ratio use for cement selery???
why the profile of shell of natural draught cooling tower is hyperabolic.
What is the difference between Hinged and pinned in Column ends
What are the different methods for drawing an arc?
Why do you want to work here
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster