What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / krishan
slab-7days
columan-24hours
beam bottom-3days
beam side-24hours
rcc wall-48hours
footing-12hours
staircase-7days
| Is This Answer Correct ? | 6 Yes | 9 No |
Post New Answer View All Answers
how to calculate rate analysys of 1:6 plastering 10 sq m
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
what are the code used for residental building?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
What is the difference between one-way slab and two-way slab?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
What are wooden shingles?
What is thumb rule for deep trench excavation
Mention different types of roof systems?
Define mirror?
What should be the standard roof height like to be?