What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase

Answer Posted / krishan

slab-7days
columan-24hours
beam bottom-3days
beam side-24hours
rcc wall-48hours
footing-12hours
staircase-7days

Is This Answer Correct ?    6 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which code is used for tor & tmt steel bar?

743


Stringer How many cm goes to landind

1195


material used for mendrel use to bend epoxy coated rebar

1693


Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)

1998


in design case of structural member best suitrable percentage of steel limit is what

1052






if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1661


CAN WORK WELL UNDER DEAD LINES OR PRESSURE?

1489


what is tension footing?

1527


What are the advantages of cad software?

647


Which ratio use for cement selery???

1377


why the profile of shell of natural draught cooling tower is hyperabolic.

1601


What is the difference between Hinged and pinned in Column ends

4767


What are the different methods for drawing an arc?

693


Why do you want to work here

1829


What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster

1842