How many number of bricks required for 1 cum & how much mortar
quantity require for 1 cum
Answer Posted / prabin chandra
200 * 100 * 75 mm bricks required 500 nos
Practically it may be varies if thickness of mortar is not
proper .. thickness of mortar should be 10-12mm
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
How much quantity of rod binding work by a rod binder per day
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
any book or article on pumped concrete.
how to disign cuplock shuttering and it's matireal requirement snd any related web site
What do you meant by gui?
How many cement sand ballast in cc 1:4:8 40mm
How to check slab shuttering level.? Or check list for slab ?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
Why nautical mile is different from statute mile?
in one SQM plaster how much Cement and sand consumed in ratio 1:4