how must steel will use for 1 cubic meter.formula of steel
for beam,column,lantern.
Answer Posted / marcus
for tendering work we can calculate acc:
foot=40kg/m3
col=175kg/m3
plinth beam=160kg/m3
slab=8kg/m3
beam=130kg.m3
Is This Answer Correct ? | 24 Yes | 33 No |
Post New Answer View All Answers
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
What is min thickness,min grade of conc & age of PQC ?
Define What is Civil Engineering?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
What are the joints wants to made in masonry where door opening, arches like etc..
What is the l/d ratio of cantilever beam?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
What you understand by richter scale?
List out some of the common problems that architect have to tackle it?
Why should appointment store person for project ? what is the benefits for company ?