If the on Of the DO module is off in the System cabinet,
then what is the Procedure to check weather the Module is
working or not.
Answer Posted / ahmed samy
Make forcing from PLC programming software to any output Channel in that DO, if output is on, LED is on means module is ok, otherwise it's faulty.
Other idea, is to replace module with similar one in the rack, if it's still off in second position that means it has a problem
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Speedtronic system .
What is the basic difference between Modbus and CAN Open Protocols
TEMPERATURE VARIATION FOR FREQUENTLY.
which processor is used in dcs.
What is instrumentation measurement?
A valve in series with an orifice plate (DP transmitter), is aligned for constant pressure in the pipeline, if there is an error dx, How to align it in process.
IN CONTROL VALVE SPECIFICATIONS GENERALLY TERM " DE- 200" ."DM -400"USED,, WHAT IS DE/ DM STANDS FOR?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
what is interlock system and why we use of this?
Draw a P& ID showing – orifice flange, plate, dp transmitter, isolation & bypass valves and tubing.
What are advantages and disadvantage of the ac supply load cell?
How ejector(or)evactor air pump is working in thermal power plant?
List three types Level Switches with their working principles
May I have a brief note above the voltage barriers? Whats is the purpose? Please mail me if you've operational details, mail id: rajkumar.diice@gmail.com
for oil & gas industries which zone is normally preferred? why? give its example?