What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / swadesh
aprox 7 Days for Slab (If RCC used from Batching Plant)
| Is This Answer Correct ? | 13 Yes | 10 No |
Post New Answer View All Answers
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
what will be price of 1:2:4pcc per kg?
what is the productivity in aluminium shuttering per day
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Which is the direction for positive angle?
pile load testing procedure
What is meant by a context menu in a cad software?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
Doul Bar reinforcement and details of drawing.
In the roof of a pumping station explain briefly the components of a waterproofing system?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
how to calculate total cost for slab 35'×8'