Why charcoal and salt add in earthing pit.
Answer Posted / ashok mishra
charcoal makes to carry the moisture content and salt to produce the HYDRONIUM ions so both are added alternate way in the earth pits
SDDIET barwala
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Please brief working principle & construction of permanent magnet AC Servo motor
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.
3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.
Why transformer used in UPS??
diff. between tension mode & speed mode
A ray hit a smooth regular surface at an angle of 20 from the normal. Calculate : 1. The angle btw the incident and reflection ray. 2. The angle of deviation.
Explain in brief description about the operation of DG sets.
Where I can get the sample question for post of Junior engineer electrical-II For RRB Bhubaneswar.
what is the circutor?why we use it ?
what is the series parallel connection of capacitors? and how can we use these application in three phase motors for controlling torque?
how to avoid Saturation in C.T?
How can a equal potential zone be carried out in conductors?
what is mean by dual digital protection in the relay field?
What is a feedback in control system?
I am completed DEEE in tamilnadu, now i am working in andhrapradesh with 2.5 year experience in relavent field. capacity of the tranformer is 11KV, 1MVA Transformer, i am eligible for getting c licence in andhrapradesh pl help me.