how to calculate steel columns beams and slab please give
me brief calculation
Answer Posted / shaik muneer
calculate the volume of slab that is L*b*h get whole answer
in cum as a thumbrule 80-100kgs per cum metre is the
quantity of steel taken for slabs either take their average
and multiply by slab(in cum)to get in kgs
| Is This Answer Correct ? | 9 Yes | 5 No |
Post New Answer View All Answers
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
In Rcc ratio calculation I wanted to know quantity of Steel also.
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
material used for mendrel use to bend epoxy coated rebar
For a washout valve why are two gate valves required in normal practice?
Critical Path Method is...
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
What is the difference between yeild strength and compressive strength of steel???
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
Would you cause a 55-gallon drum of water to weigh more by climbing in?
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
can stub column take the load as main column