What is the role and reponsibilities of Electrical
Engineers in construction field?

Answer Posted / dharmendra kumar

Top-performing electrical site engineers have good communication skills in addition to time management and complex problem-solving abilities, according to O*Net OnLine. To perform the necessary tasks, they might use laboratory evaporators, signal generators, semi-conductor process systems, spectrometers and computer-aided design software, such as Finite Element Method.

Is This Answer Correct ?    9 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HI SIR, AM PREPARING FOR RRB FOR SECTION ENGINEER POST. PLZ SEND ME THE PREVIOUS QUESTION PAPERS AND HELP ME. I HAVE NO ENOUGH TIME MY EXAM DATE IS 22ND JUNE.... MY EMAIL ID IS nalla.amarnath@gmail.com

2009


XYZ

2235


send me any model test paper of clerical post of state bank of india.......

1939


1. for eg, capacitor is used for many purposes(it act as filter, oscillator, bypass capacitor, memory storage etc...) 2. Please tell me some example circuits for different uses of capacitor( whenever and whereever and however we used capacitor as a filter, oscillator tuning etc..) 3. similarly for inductor and resistors(it act as what?) and when and how we want to act as like that?, and how we can used these components depends upon our requirments with example circuits and explanation? design to act as these components depends

1913


PLS SEND THE RRB CHENNAI MODEL QUESTION PAPER my email id is ganesan98655@rediffmail.com

2113


DRAW ACIRCUIT DIAGRAM OF 100 KVA 415V/55-0-55V DELTA TO STAR TRANSFORMER

2134


where are the circulat the diesel in DG parts name with pictue

2228


i've iocl interview.. if you know the interview process please give me information..

2135


Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason

2039


What will be result if we connect LT votage to the terminal of HT motor?

2228


i m in need of current rating chart of heavy duty pvc/xlpe, cu/al cables. can somebody provide me? if yes, plz send me at ashish_patel111@yahoo.com

2095


i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400

2268


IF ANYONE HAVE ANY QUESTION ASK ME AT MY MAIL anmol.bhardwaj5@gmail.com

2178


pls,send the previous year written test questions.

1999


What is the basic principal, by which DC voltage level is increased more than the supplied AC voltage during conversion. As upto AC level it is contorrled by firing anlge but after maximum level how is it possible.Please clear picture. OR we have to supply the higher level AC?

2055