how many bags of cement,sand and Aggregate to p.c.c. of 1:2:4
ratio.
Answer Posted / m.uzair
1 Bag . 2cft sand and 4cft crush
| Is This Answer Correct ? | 3 Yes | 12 No |
Post New Answer View All Answers
why we use 19x9x9and 20x10x10 but not other
Define a polyline?
Prepare a Schedule for a Highrised building from starting stage to Handover?
What happens to Load at yielding ?
what are the types of design? which type of method is used at what type of design & why?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
How to do base isolation for RC framed structure using ETABS software?
Define What is the distance between railway tracks?
How to compute minimum number of columns required for a site from area of site?
What is the difference between shear and tensile strength?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
Explain what is zoning permit?
in design case of structural member best suitrable percentage of steel limit is what
in one SQM plaster how much Cement and sand consumed in ratio 1:4
how to calculate testing date