How can we cross check the excavation and backfilling
quantities.

Answer Posted / ajay

In case of building it will be 60%
In case of normal excavation it will be 90% without compaction
In case of compaction it will be 100%

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to decide/consider the grade of bitumen for dbm.

1765


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

1812


how do you calaculate the total steel quantity of an rcc building using thumb rule?

3196


a butt weld is specified by

2583


What is labor and material payment bond?

631






what post do you prefer to work in this company and why do you think you can serve better in such position?

2235


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2260


Define line type?

677


Advantage of Aluminum form work in terms of activities can be skip and cost too

560


what is directivity effect?

1719


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7050


how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail

3492


What is 1/8 on the architect ruler denotes?

644


what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..

2037


what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?

1558