How can we cross check the excavation and backfilling
quantities.
Answer Posted / ajay
In case of building it will be 60%
In case of normal excavation it will be 90% without compaction
In case of compaction it will be 100%
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to decide/consider the grade of bitumen for dbm.
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
a butt weld is specified by
What is labor and material payment bond?
what post do you prefer to work in this company and why do you think you can serve better in such position?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Define line type?
Advantage of Aluminum form work in terms of activities can be skip and cost too
what is directivity effect?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
What is 1/8 on the architect ruler denotes?
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?