How can we cross check the excavation and backfilling
quantities.
Answer Posted / ajay
In case of building it will be 60%
In case of normal excavation it will be 90% without compaction
In case of compaction it will be 100%
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What is the significance of cost estimate knowledge for an architect?
What are new methods /technologies of pothole patching?
how many tonnes equals to one cubic feet?
What is portland cement
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
what are the Task work of different labour.?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
What is bmc stands for in bmc software?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard