Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

calculation of cement bags in 1:2:4 concrete mix

Answer Posted / vinesh

cement :1*1.54*28.5/7=6.27 Bags
sand :2*1.54/7=0.45 Cum.(0.83tons)
Metal :4*1.54/7=0.9 Cum (31.7Cft)

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

2070


Where will be the maximum bending moment in a TEE Beam?

7659


i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

2006


What is thumb rule in quantity and cost estimation of a residential building?

3177


If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

2383


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2499


what are the duties of Site Engineer in work site?

1679


Who designed the city of washington dc?

1334


by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

2217


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

2182


Time required for curing of wall tiles before fixing

2259


what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?

2352


What is a projection line?

1226


Why we provide hair pin for shed

2424


How much time Required for PPR pipe network testing

2186