What is the used of economizer in boiler?
Answer Posted / rohit dimri
to feed water in boiler.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Specific strength of materials is very high when they are in fibre size but lower when they are in bar form why ?
List the energy saving opportunities in air compressor system.
What is burnt-out point ?
What will you check if one cylinder of your engine is not like the others?
What is wrap-around?
hall ticket copy
What school did you attend in engineering?
can someone explain tolerances on bolts what the symbols mean
Identify or enumerate the parts of stern tube
List at least two factors that promote transition from ductile to brittle fracture.
Disposal of radioactive waste materials and spent fuel is a major and important technology. How the waste radioactive material is disposed off ?
Explain why would some industries select pneumatics over hydraulic?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
pl. send me jr.engg.model question for rrb malda.
working of nuclear power plant