can you give me the details of rate analysis of steel and concrete?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What is a bearing capacity of soil?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
What are the main reasons for conducting pull-out tests for soil nails?
What are the skills required to become an architect?
What is the difference between engineering stress and true stress?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
how to calculate total cost for slab 35'×8'
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
What is passive earth pressure ?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?