What is meant by 'zero value' in quantity surveying.
Answer Posted / ilayaraja
Difference between BOQ cost and actual cost.
| Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
How much quantity of rod binding work by a rod binder per day
What is the standard volume of pharma in cub ft
What goals do you have in your career?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
What are the uses of groynes?
what is escalation?how it is done?
What is costing in 100squre feet bricks
What are your future hopes for this job?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
Define line type?
Which is stronger solid steel rod or hollow steel pipe?
Formula of mid span bar
Time required for curing of wall tiles before fixing
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
why the openings of sieves are square io size?