What is meant by 'zero value' in quantity surveying.

Answer Posted / ilayaraja

Difference between BOQ cost and actual cost.

Is This Answer Correct ?    14 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1330


Why Should Curing Not Be Done By Ponding And Polythene Sheets?

779


What is zoning permit?

697


what is the service corridor?

1920


how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation

1224






What is a tensile strength? What is the tensile strength of wood?

678


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1097


Mention different types of roof systems?

733


The portion of a brick cut across the width is called?

972


How to decide/consider the grade of bitumen for dbm.

1767


how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1441


1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall

1934


what is the use of beam end forces while using a staad ? wha they are show

2480


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

1349


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3260