What is meant by 'zero value' in quantity surveying.
Answer Posted / ilayaraja
Difference between BOQ cost and actual cost.
| Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Define What is made from large rocks, which protects the base of cliffs?
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
what is grade intersection?
what is total volume of ingredients used in concrete accordingly
significance of specific surface area of particles?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
What things architect have to take care of before starting any project?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
what are RIB slabs explain about it
What is the worlds largest concrete dam?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?