What is meant by 'zero value' in quantity surveying.
Answer Posted / ilayaraja
Difference between BOQ cost and actual cost.
Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
What is zoning permit?
what is the service corridor?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
What is a tensile strength? What is the tensile strength of wood?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
Mention different types of roof systems?
The portion of a brick cut across the width is called?
How to decide/consider the grade of bitumen for dbm.
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
what is the use of beam end forces while using a staad ? wha they are show
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)