how many 1st class bricks in 1cu feet?
Answer Posted / nouman quqntity sarvair from s
volume of brick= .75'x.25'x.375'
volume=.070cu ft
now in 100 cft = 100/0.070
=> 1428.57 nomber of bricks
now 10% mortar /////
deduction of mortorr= 10x1428.85/100 = 142.85
nomber of bricks
so net number of bricks = 1428.57-142.85= 1285.72
now for contengencies = 5%
so => 5x1285.72/100= 64.28
now total nomber of bricks= 64.28+1285.72=1350.006 NOMBER OF
BRICKS
HENCED PROVED
PROUD GOES TO BE A ((( Q.....S)))
Is This Answer Correct ? | 65 Yes | 11 No |
Post New Answer View All Answers
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
What is the difference between absorption & adsorption and sorption?
what do you know that m20,m25
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
What is the average density of soil?
why do we not deduct volume of steel to find actual volume of concrete in practical???
what is the weight of 12mm aggregates?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
Technical Question of Civil Engineering
it is possiblee to produce concrete with out cracks...
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
what are the ffactors you considered choosing the course?
how many digree of freedom in four bar chain
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?